Gas Furnace Processing Systems
Gas Furnace Run Tester
Overview
VTI’s Gas Furnace Run Tester is engineered to provide reliable Run, Electrical and Functional tests for Gas Furnace manufacturing.
This Run Tester measures Gas and Electrical consumption along with overall functionality of a completed unit. The variable transformer allows the Unit Under Test (UUT) to be run at specific voltages for testing. The integrated Hi-Pot is used for high potential (high voltage) testing to verify electrical soundness.
The control system is integrated with the customer’s database to provide real-time data. It is also interlocked with other equipment on the production line to guarantee testing requirements are met in production.
- Product: Gas Furnace
- TAKT Time: 3 Minutes
- Hi-Pot Tests: AC, DC, IR, Continuity
- Measures: Volts, Amps, BTUs
- IO: Software Configurable
- Test Sequence is User Configurable
- Installation Date: 2019
Gas Heat Exchanger Leak Test System
Overview
VTI’s Gas Heat Exchanger Leak Test System is engineered to perform a reliable “Rate of Rise” (ROR) leak test for gas heat exchanger manufacturing.
This custom system allows leak testing for multiple sized heat exchangers ranging from three to seven tubes. The system pulls a vacuum on the Unit Under Test (UUT), until a set pressure is acquired. A ROR test is then performed, if the UUT receives a “pass” it will move down the manufacturing line accordingly. If a “pass” is not obtained the system will perform the same vacuum and ROR testing sequence on each tube individually to pin point which tube is leaking.
The control system is integrated with the customer’s database to provide real-time data. It is also interlocked with other equipment on the production line to guarantee testing requirements are met in production.
- Product: Gas Heat Exchanger
- Leak Reject Rate: 28 Torr
- TAKT Time: 60 Seconds
- Pump Size: 17.7 CFM
- Installation Date: 2014